Dam break modelling and flood inundation mapping for Kabuyanda multi- purpose Dam, Isingiro district.
(2020-11)
In many locations around the world, dams are essential for flood control, water supply, irrigation,
hydropower, navigation, and recreation. This is synonymous with Uganda, where the one single
investment that would lay ...
Estimation of stockpile volumes at construction sites through the use of unmanned aerial vehicles : a case study of CCCC Construction Plant in Kajjansi - Uganda
(Makerere University, 2020-11)
The efficiency of volumes determined in various fields of survey; mining, quarry, hydrographic and engineering fields can’t be overemphasized. Conventional surveying method using Total station and recently through the use ...
Proposed completion of the main library short tower / graduate wing at Makerere University Business School (MUBS)
(Makerere University, 2020-12-09)
This report contains the construction and project management practices that the author participated in as the Contractor’s Quantity Surveyor and assistant Project Manager during the construction of the Main Library Short ...
Construction of Buyende Town Water Supply System.
(2021-02-15)
This project report contains details for the construction of the Buyende Town Water Supply
System project, Procurement Reference Number MWE/WSDF-E/WRKS/14-15/00118 from
start to practical completion, in which the author ...
Construction of limur bridge on limur river on Latida –Bwot atum community access road in Lamwo district, Northern Uganda.
(2021-01)
As a result of economic stagnation arising out of many years of insurgency in Northern Ugaada,
the Government of Uganda instituted a number of development interventions, in which project
for Restoration of Livelihood in ...
Upgrading of Kikandwa and Buseregenyu Health Centre IIs to Health Centre IIIs
(2021-04-23)
This report details the construction methodology and the positive aspects of construction project management exercised by the author and the project team at large while part of the team that implemented upgrading of Kikandwa ...
Construction supervision of the office premises (ERA house) for the Electricity Regulatory Authoruty (ERA) at plot 5c1, third street, Industrial area.
(2020-12-21)
This report documents the work done by the author during the cconstruction supervision of the new
office premises, New ERA House, for the Electricity Regulatory Authority (ERA) at Plot 5C1, 3rd Street
Industrial Area.
The ...
Construction of inland revenue department office in Hargeisa, Somaliland.
(2020-12-22)
This report mainly gives an account of the procedures taken during design and implementation
including environmental and health requirements of the Construction of Inland Revenue
Department Office in Hargeisa, Somaliland. ...
Evaluating the impact of land cover change on land surface temperatures in Kira Municipality
(Makerere University, 2020-11-17)
Changes in Land Surface Temperature (LST) have often been linked to changes in land cover. There is however, lack of adequate accurate information regarding the impact of land cover change on LST especially in developing ...
Monitoring spatial-temporal changes of urban land transition using remote sensing : a case study of Lira Municipality
(Makerere University, 2020-11-30)
Lira municipality is one of the 14 pioneer municipalities earmarked by Uganda Government’s Vision 2040 to attain regional city status. The municipal’s population was reported to be at 99,551 in 2014 and projected to ...