• Login
    View Item 
    •   Mak IR Home
    • College of Engineering, Design, Art and Technology (CEDAT)
    • School of Built Environment (SBE)
    • School of Built Environment (SBE) Collections
    • View Item
    •   Mak IR Home
    • College of Engineering, Design, Art and Technology (CEDAT)
    • School of Built Environment (SBE)
    • School of Built Environment (SBE) Collections
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Switchyard riverbank erosion remedial works and upstream slope stabilization works

    Thumbnail
    View/Open
    PGD project report (7.402Mb)
    Date
    2023-10-30
    Author
    Olwa, Emmanuel
    Metadata
    Show full item record
    Abstract
    It is a requirement of students doing a Post Graduate Diploma in Construction and Project Management at the College of Engineering Design Art and Technology in Makerere University to write-up a technical report about training undertaken at a construction company. It is expected that this training would entail the student participating in site activities on an on-going construction project or reasonable size and scope at the company. The intention is to ensure that students relate their technical, project management, and contract administration knowledge acquired from the classroom setting to actual practice in the construction industry. This student was attached under the Construction Service Head Department as assistant Project Manager on the switchyard riverbank erosion remedial works and upstream slope stabilization work. The report focuses on construction project management and contract administration, but also details the activities carried out during the implementation of the project. The student was involved in the management and supervision of site works, providing leadership to the contractor’s project team, preparation of contract documents attendance of weekly meetings and preparation of monthly progress reports. The student also ensured cost monitoring, and quality control through supervision and ensuring use of approved materials by the contractor. These responsibilities paved the way for the student to gain more practical experience in managing projects through the utilization of software, different project documents and the client’s contract team. This project report therefore entails details about the execution of the switchyard river bank erosion remedial works and upstream slope stabilization work
    URI
    http://hdl.handle.net/10570/13111
    Collections
    • School of Built Environment (SBE) Collections

    DSpace 5.8 copyright © Makerere University 
    Contact Us | Send Feedback
    Theme by 
    Atmire NV
     

     

    Browse

    All of Mak IRCommunities & CollectionsTitlesAuthorsBy AdvisorBy Issue DateSubjectsBy TypeThis CollectionTitlesAuthorsBy AdvisorBy Issue DateSubjectsBy Type

    My Account

    LoginRegister

    Statistics

    Most Popular ItemsStatistics by CountryMost Popular Authors

    DSpace 5.8 copyright © Makerere University 
    Contact Us | Send Feedback
    Theme by 
    Atmire NV