• Login
    View Item 
    •   Mak IR Home
    • College of Engineering, Design, Art and Technology (CEDAT)
    • School of Built Environment (SBE)
    • School of Built Environment (SBE) Collections
    • View Item
    •   Mak IR Home
    • College of Engineering, Design, Art and Technology (CEDAT)
    • School of Built Environment (SBE)
    • School of Built Environment (SBE) Collections
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Technical report for the upgrading of Hoima-Butiaba Wanseko road (111km) to paved (bituminous) standard

    Thumbnail
    View/Open
    Master's Dissertation (2.785Mb)
    Date
    2023-06
    Author
    Kanyijuka, Robert
    Metadata
    Show full item record
    Abstract
    This project report contains details about the construction supervision of the civil works for the upgrading of Hoima-Butiaba-Wanseko road project as of June 2023. The report focuses on construction project management and contract administration, but also details the activities carried out during the implementation of the project. Under Chapter One is discussed the background of the project, problem statement, its objectives, scope and other project details like the organization structure, project overview. This chapter also expressly states the author’s involvement on the project as an intern Assistant Material’s Engineer. Chapter Two covers the project execution including the acquisition of works, execution of works, project management and contract administration aspects of the project. The different tools and techniques used in the actual construction that took place on site are discussed in this chapter, right from bush clearance to wearing course and ancillary works. The project management techniques employed to manage time, cost and quality are also discussed in detail. The challenges encountered during project execution are discussed in Chapter Three of this report. Some of the challenges were at company level, project level and personal level. The solutions proposed to address these challenges are also discussed in this chapter. Chapter Four details the conclusions drawn by the author about upgrading of Hoima-Butiaba Wanseko road project based on the experiences drawn during his participation in this project. Additionally, the author makes recommendations on how this can be successfully implemented, going forward, basing on the lessons learnt during the internship.
    URI
    http://hdl.handle.net/10570/13000
    Collections
    • School of Built Environment (SBE) Collections

    DSpace 5.8 copyright © Makerere University 
    Contact Us | Send Feedback
    Theme by 
    Atmire NV
     

     

    Browse

    All of Mak IRCommunities & CollectionsTitlesAuthorsBy AdvisorBy Issue DateSubjectsBy TypeThis CollectionTitlesAuthorsBy AdvisorBy Issue DateSubjectsBy Type

    My Account

    LoginRegister

    Statistics

    Most Popular ItemsStatistics by CountryMost Popular Authors

    DSpace 5.8 copyright © Makerere University 
    Contact Us | Send Feedback
    Theme by 
    Atmire NV